My soapy thing was going into my soap-room-in-progress. Sheetrock is installed; next is taping and texturing. The sheetrock guy says he expects to be done by next Thursday at the latest. Then it's time for painting the walls (we will do this ourselves), installing the door (DH will do this), putting up a couple of cabinets (SIL will help with this), and then installing the lights and fan (electrician will do this).
DH actually knows how to do everything, but can no longer physically do much that requires having his arms overhead. It's been hard for him to wait on others to get it done, plus few people match up to his quality expectations. He's learned to relax a bit about it all, especially when I remind him that it's a soap room, not a living room. Yes, it also will be my work-at-home office for all those zoom meetings, but that's what fake backgrounds are for, right?